EUTECH INSTRUMENTS WP PCD 650 Instrukcja Obsługi Strona 100

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 120
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 99
Instruction Manual PCD 650
92
This page allows you to set operating parameters for resistivity measurement
mode. The Pure water coeff, Lnr Temp Coefficient, normalization temperature, cell
constant, calibration due, calibration points are set the same way as previously
described in Conductivity set up. See Conductivity Settings – Page 1on page 86.
4.9 Resistivity Setup
Resistivity setup screen present many options to control the operating parameters,
which can be controlled and set from the resistivity setup screen. The settings are
displayed in 2 pages. Press NEXT-P (F2) and PREV-P (F1) to navigate through
these pages.
4.9.1 Resistivity Settings – Page 1
Figure 84: Resistivity Settings - Page 1
4.9.2 Resistivity Settings – Page 2
Figure 85: Resistivity Settings - Page 2
Przeglądanie stron 99
1 2 ... 95 96 97 98 99 100 101 102 103 104 105 ... 119 120

Komentarze do niniejszej Instrukcji

Brak uwag